Continuous Monitoring for New Mexico’s Ozone Precursor Rule

Executive summary

  • In October 2026, NMED approved Qube's Part 50 Alternative Equipment Leak Management Plan (AELMP) as a pre-approved plan. Operators notify NMED in writing before starting, with no site-by-site application.

  • Qube Fenceline and Qube Lite are approved as an alternative to scheduled AVO and OGI inspections under New Mexico's Ozone Precursor Rule.

  • Each site is screened over a pre-declared 7-day period against a threshold of 5, 10, or 15 kg/h. An OGI inspection is needed only when a screen fails.

  • At a typical well site, 56 scheduled site visits a year become 12 remote screens.

  • In a 12-month lookback across 61 New Mexico sites, compliance site visits fell from 3,416 to about 101, a 97% reduction.

  • The NMED approval uses the same method EPA approved for OOOOb, so one screening program can serve both.

  • At many sites, the technology pays for itself in under a year.

  • Continuous data also prepares operators for the proposed super-emitter rule, which would give them 3 days to investigate and repair a large release.

Introduction

Part 50 applies to oil and gas sources in eight New Mexico counties: Chaves, Doña Ana, Eddy, Lea, Rio Arriba, Sandoval, San Juan, and Valencia. It sets a required frequency of AVO and OGI or Method 21 inspections.

AVO inspections are weekly at wells above 10 bbl/d of oil or 60 mscf/d of gas, and monthly below both thresholds. Sites within 1,000 ft of an occupied area stay on weekly AVO. OGI or Method 21 frequency depends on facility type and potential to emit (PTE), defined by tons per year of VOC emissions.

What the Ozone Precursor Rule expects of operators

Part 50 applies to oil and gas sources in eight New Mexico counties: Chaves, Doña Ana, Eddy, Lea, Rio Arriba, Sandoval, San Juan, and Valencia. It sets a required frequency of AVO and OGI or Method 21 inspections.

AVO inspections are weekly at wells above 10 bbl/d of oil or 60 mscf/d of gas, and monthly below both thresholds. Sites within 1,000 ft of an occupied area stay on weekly AVO. OGI or Method 21 frequency depends on facility type and potential to emit (PTE), defined by tons per year of VOC emissions.

OGI or Method 21 survey frequency under Part 50, by facility type and potential to emit.

A large number of production sites land in the weekly AVO plus quarterly OGI bucket. At a typical well site, that means 52 weekly AVO inspections and 4 quarterly OGI inspections a year.

That schedule carries a significant cost. Each inspection takes manpower, and the documentation required with each one can be onerous in the case of an audit. The number of inspections also scales linearly with the number of sites. At 50 sites, an operator does about 2,800 inspections a year. At 500 sites, it is about 28,000.

Repairs and records carry their own requirements: a 30-day repair clock, 5-year records retention, and annual reporting to NMED.

The required program is built around finding every leak, at any size, on a fixed schedule. LDAR inspections happen at every site whether or not anything is leaking. A schedule-based program also sees leaks only on inspection day. Under quarterly OGI, a leak that starts in February keeps running until the next scheduled inspection.

Required site visits under default Part 50 LDAR: 56 a year at a typical well site, and about 28,000 a year at 500 sites.

How Qube’s approval works

Qube holds a pre-approved Part 50 AELMP, approved by NMED in October 2026, to use its technology as an alternative to OGI and AVO surveys in New Mexico. Because the plan is pre-approved, an operator notifies NMED in writing before starting and does not need a site-by-site application.

An alternative compliance program uses a different technology to meet the requirements of the approved methods. In New Mexico, those methods are AVO, OGI, and Method 21. In Qube's case, the technology is continuous monitoring. Regulators approve an alternative when it is shown to be equivalent to the required program.

Qube has about 11,500 devices deployed across three product lines, with more than 140 operators using them. Its fixed, solar-powered monitors run 24/7 and feed one data platform, and its field technicians are based in New Mexico.

Qube offers five technologies on that platform. Two are approved under Part 50: Qube Fenceline, perimeter sensors that locate and quantify site emissions, and Qube Lite, low-cost intrinsically safe sensors at the source for tank tops and smaller sites. They can be deployed independently or together, which gives three configurations approved for use by the regulator. Qube Camera, Qube OGI Camera, and Qube Handheld support follow-up and verification.

Qube's monitoring modalities. Qube Fenceline and Qube Lite are the devices approved under Part 50.

How Qube’s alternative program meets Part 50 obligations

Like the traditional AVO and OGI program, Qube's pre-approved alternative program achieves compliance with the same Part 50 obligations. Leaks are repaired within 30 days, records are kept, and results are reported to NMED every year. The alternative program changes how leaks are found and when an LDAR inspection is needed.

The required Part 50 program compared with Qube's alternative program.

Equivalency: finding bigger leaks faster

"One of the ways I like to think about alternative compliance is you're really changing the definition of what a leak is," said Alex MacGregor.

With an OGI camera, crews go out on a set schedule, survey every component, and fix every leak they find. A continuous monitoring program looks at specific thresholds: 5, 10, or 15 kg/h in Qube's case. If a site exceeds its threshold over a one-week screening period, the operator sends someone to site for a follow-up survey. The program focuses on larger leaks and finds them faster. Because those leaks are actioned sooner, the alternative program achieves the same or greater emissions reduction as the default program. A program is approved when it is shown to be equivalent to the required program from an emissions reduction perspective.

A spike above a 10 kg/h threshold does not fail the screen on its own. The 7-day block average determines the result.

Common questions we receive from operators about how the block works:

  • Is the 7-day average a rolling average?

    The block average is equivalent to the 7-day rolling average on the 7th day of the period.

  • Which emission rate counts?

    Qube uses its best estimate: a 1-hour rolling average rolled up into a block average based on the cumulative detected data in the period. The work practice uses the absolute 7-day block average and does not subtract the facility's baseline emission rate.

  • When does the block run?

    Operators have flexibility to pre-declare when the 7-day block falls within the required month, such as midnight on the 7th to midnight on the 14th. Operators deploying at scale usually find it easier to declare one common block for all sites. Managing separate windows for several hundred sites can be administratively onerous.

Choosing a threshold

Qube's AELMP offers thresholds of 5, 10, or 15 kg/h, each at 90% probability of detection, with 3 to 12 screens a year. The threshold an operator selects, together with the site type and Part 50 tier, drives how often screens are required. A more permissive threshold such as 10 or 15 kg/h often comes with a monthly screen. A lower threshold can reduce the frequency to quarterly or triannual, depending on the site type. The trade-off is a greater chance of an exceedance at a lower threshold.

Operators can pick a work practice that fits each site. Some small well sites may run a lower threshold with less frequent screens. A larger facility such as a central tank battery may run a higher threshold on a monthly cadence.

Approved Qube work practices by site type and threshold.

One work practice for state and federal programs

EPA approved Qube in March 2025 as alternative test method MATM-008. Qube was one of the first point sensor continuous monitoring technologies approved by EPA for periodic screening under OOOOa and OOOOb, and the approval extends to OOOOc if a state implements that program. The NMED approval uses the same method EPA approved: the same 7-day block-average screen and the same 5, 10, and 15 kg/h thresholds. One screening program and one data set can serve both. Where schedules overlap, a single screen counts for both programs, and the NMED and EPA reports draw on the same records. Reporting stays separate, with annual reports to NMED and to EPA through CEDRI. This means even less work for sites that adhere to both rules. Part 50 depends on where a site is, and OOOOb depends on when it was built or modified. A site in a Part 50 county built or modified after December 6, 2022 falls under both. Under the New Mexico EMNRD Part 27 rules, Qube is recognized as ALARM technology for gas capture credits. One technology application can fulfill multiple regulatory reporting requirements where they apply.

The same Qube continuous monitoring work practice supports both NMED Part 50 and EPA OOOOb reporting.

What reduced inspections look like in practice

At a typical well site, Part 50 requires 56 site visits a year: 52 weekly AVO inspections and 4 quarterly OGI surveys. Under Qube's AELMP at a 10 kg/h threshold, that becomes 12 remote screens a year. Those 12 screens demonstrate equivalency under the program. An OGI visit is required only if a site fails its screen. In some instances, an OGI inspection can also substitute for a screen or serve as a required survey under EPA OOOOb work practices.

At a typical well site, 56 scheduled site visits become 12 remote screens.

Case study: a New Mexico operator with 61 sites

Qube ran a 12-month lookback for a New Mexico operator with 61 sites monitored by Qube. At one tank battery, from July 2025 to June 2026, the hourly emission rate was sawtooth, moving up and down throughout the year. That facility required a monthly screen at the 10 kg/h threshold. Every 7-day block average stayed below the threshold, and all 12 monthly screens passed.

Across the 61 sites, the required program called for 3,416 site visits over the year. Under Qube's 10 kg/h work practice with monthly screens, the same sites ran 732 remote screens. Forty of those screens (5.5%) had a 7-day average above 10 kg/h and needed a follow-up visit to find and repair the leak. Those 40 follow-ups, plus 61 annual OGI surveys required for EPA OOOOb, bring the total to about 101 compliance site visits, down from 3,416. That’s a 97% reduction.

Lookback results for a New Mexico operator under the 10 kg/h monthly work practice.

How the program scales

At 50 sites, the required program means about 2,600 scheduled AVO visits a year. At 500 sites, it means 26,000. Applying the 5.5% fail rate from the New Mexico lookback, those 26,000 visits become about 328 follow-ups. Each site goes from 52 scheduled AVO visits a year to about 0.7 follow-ups, and LDAR inspections go where a leak is.

Site visits per year under default LDAR and with Qube follow-ups.

The economics

At many sites, the program pays back the technology in under a year: about 6 months at a facility with 4 Qube Fenceline devices, and about 7 months at a single-well site with one Qube Lite. The payback reflects the reduction in field work, the administrative documentation that goes into each inspection, and extra product kept in the pipe that can be sold.

Monitoring between screens

Continuous monitoring data outside the screening period is not required for compliance. Operators can use it for ongoing voluntary monitoring, such as responding to operationally relevant emissions alarms. Faster repairs between screens lower the chance of a compliance period failing its screen. A failed compliance window carries a formal procedure for confirming the repair, tagging it, and reporting on it. Outside those windows, operators can follow their normal processes when they identify a leak and bring it back under control far more quickly.

Beyond inspections: what continuous monitoring adds

Qube’s continuous monitoring solution works 24/7. The same data that drives compliance screens supports the rest of a robust emissions management program.

Find leaks when they happen

A survey only sees what is leaking on survey day. With quarterly OGI surveys in January, April, July, and October, a leak that starts in February runs about 6 weeks until the April survey finds it. With continuous monitoring, the same leak raises an alarm within hours. Finding the biggest leaks faster is how an alternative program reaches equivalent emission reductions.

A February leak under quarterly OGI compared with continuous monitoring.

Localize and quantify releases

Qube pairs low-cost hardware with algorithms and software that detect, localize, and quantify emissions from oil and gas facilities. For screening, Qube uses its best estimate of the emission rate: a 1-hour rolling average rolled up into a block average based on the cumulative detected data in the period. With site-level data, the source of a release is easy to pin down, and operators can confirm the details in the data before going to the field.

Streamlined reporting

The Qube platform is the system of record. It holds time-bound emissions, alarms, screening results, tickets, and surveys in one place. Each screen produces a 7-day average that is compared to the site's threshold. When a screen fails, the operator documents the full response, from confirming the source to tagging and repairing the leak, for reporting to NMED. Post-repair data documents the fix. Screen results plus follow-up and repair records feed the annual NMED report, and the same records support OOOOb reporting to EPA.

Integration with operational workflows

When an alert fires, Qube's follow-up tools help crews confirm and close it. Qube Camera captures HD images of what was happening on site at the time of the alert. Qube OGI Camera provides thermal gas imaging of tanks, valves, and flares, day or night. Qube Handheld is a laser detector for follow-up and repair checks, with a companion mobile app. Between screens, operators can respond to operationally relevant emissions alarms through their normal processes. Qube's field technicians are available across North America including Carlsbad, New Mexico.

Preparing for the proposed super-emitter rule

New Mexico has proposed a statewide methane abatement rule, 20.2.51 NMAC, which is working through its regulatory process. It is a state-level super-emitter rule. Certified third parties would detect events by satellite or aircraft and submit the data to the state, which then passes it to the operator and asks the operator to justify what happened.

As proposed, a super-emitter event is 50 kg/h or more. NMED would notify operators with a source within 50 m of the publicly posted super-emitter notification. That notification starts a clock:

  • Within 3 days, the operator must investigate and repair. The investigation can use up to 30 days of maintenance or process data, including all monitoring data available at the source or facility.

  • If the operator cannot identify the source from that data, it must screen the entire facility with OGI plus AVO.

  • A signed report to NMED is due within 15 days, with recordkeeping requirements.

The civil penalty ceiling is $15,000 per day, per violation. A public hearing is expected in December, followed by final rulemaking. The rule is still a proposal, and its requirements could change before adoption.

What the proposed super-emitter rule requires, and how continuous monitoring prepares operators.

A program built to find large leaks quickly is already doing what the super-emitter rule tests for. Qube alarms flag large releases within hours, often before a satellite or aircraft flyover detects them, so the operator can control them before an NMED notification arrives. If a third-party detection does come in, time-stamped emission rates already cover the 30-day data review. Site-level data shows whether the event came from the operator's facility or a neighbor's. It also makes the source easier to pin down, so there is less risk of a full-facility OGI screen inside 3 days. Once the emission rate comes back to baseline, post-repair data documents the fix for the report.

Next steps

Book a demo with Qube.

Questions about Qube's Part 50 approval or how it applies to your sites? Contact the Qube team at info@qubeiot.com, or reach out to your Qube customer success manager.

The full webinar recording is available here: Continuous Monitoring in New Mexico: Reduce Inspection Costs, Improve Environmental Performance, and Meet Ozone Precursor Rule Compliance

Interested Qube Technologies’ secure, cost-effective continuous monitoring solutions? Explore our other resources and case studies or reach out directly. 